Body Update

The body has been primed and it looks like we should have it back in early February.  In the mean time, we have installed the carpeting, seats, seat belts and stereo system, which we have neatly tucked inside the glove box.  Due to the position of the heater, it was necessary to install the glove box in the rear firewall between the two seats (see photo below).  The stereo will be operational via remote control.  We also installed a Ford Racing wiring loom to tidy up all the wiring.  We will post ures of the body as soon as we get it back.

Back to www.shmotorsny.com

About these ads

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: